Advertisement

New artificial football pitch being proposed for Keynsham school

Plans have been unveiled for a 3G artificial grass pitch with floodlighting at Wellsway School in Keynsham.

Futura Learning Partnership has lodged a planning application with Bath & North East Somerset Council to replace a natural turf pitch at the Chandag Road campus with an all-weather facility that will serve both the school and community, including grassroots clubs, partner organisations, and inclusive sports programmes.

Six 15-metre-high galvanised steel columns, each equipped with energy-efficient LED luminaires, are proposed. The adjacent hockey pitch floodlighting is of a similar height.

The scheme also includes 4.5-metre-high perimeter fencing, hardstanding areas, a storage container for maintenance equipment and sports kit, and an access footpath.

The application says the proposed 3G pitch, measuring 97 metres by 61 metres, will be more than 70 metres north of the nearest house so the predicted noise reaching it will be below the 50 dB criterion as set out by the World Health Organization.

The proposed opening hours will be 8am to 10pm Monday to Saturday, with lights out and the facility locked up by 10.15pm; on Sundays and bank holidays will be 8am to 8pm, with the final curfew at 8.15pm.

Public transport, drop-off / collect systems, and car-sharing will be promoted to all visitors unable to walk or cycle their whole journey to and from the school.

The development is said to have been carefully designed to comply with both FA and Sport England guidance and will deliver “much-needed grassroots football infrastructure for Wellsway School and the wider Keynsham area”.

The application says: “The design complements Wellsway School and the surrounding environment, ensuring minimal visual impact. It is sympathetic to its surroundings, avoiding any unacceptable impact on adjacent public areas or residential neighbours.”

The school’s playing fields are dissected with a line of trees and the proposal will include their removal. It is proposed that 19 more trees are to be planted elsewhere on site to directly compensate for the loss. Additionally, the scheme will be subject to biodiversity net gain rules.

The planning reference is 26/01838/FUL and the deadline for comments is 9th June.

Advertisement

Advertisement

Top Stories

Advertisement

Advertisement